Following on from an embankment slip late December 2019 and a second slip in February 2020, remedial works were required to stabilise the embankment at Cookspond. The works split into two packages, emergency works to immediately stabilise the embankment and planned works to maximise the use of the site mobilisation and prevent future slips in the adjacent area. Sunville Rail were contracted to carry out the works to reinstate the boundary fence at Cookspond Embankment....
December 2020
January 2021
Sunville Rail were awarded works to install 256m new boundary fence at Widnes Alstrom Train Depot...
July 2020
August 2020
Sunville rail were awarded the contract to pull and install 2 x New 5 core cables 375M long at Morden....
March 2020
April 2020
South Western Trains are increasing their sidings capacity at Fratton site installing 3 new sidings...
December 2019
Sunville Rall contracted by Kiers to work on the Faster Safer Isolation technology project...
October 2019
To remove existing palisade fencing and install new security Exmesh fencing at Morden train Depot...
September 2019
DC switchgear renewal at Petts Wood, and contruction of new TP hut...
November 2018
Victoria Area Re-Signalling Phase 2b Sutton & Wimbledon...
November 2018
Raynes Park and Selhurst Area – Supervisory Renewals, Southern Region...
August 2016
106412– HV Cable Route Refurbishment project throughout Wessex ECR area...
June 2016
Civils works as part of the complete build and commission of a train care depot at Three Bridges....
October 2015
The design, supply, construction civils and fibre works at 80 sites across the Canterbury ECR...
August 2015
134573 HV Switchgear Renewals – Package D...
December 2014
Undertrack crossing design and construct for the DNO project - Kent area....
November 2014
May 2015
Southern DC Traction PSE Wessex & Sussex Substations...
February 2014
Sunville Rail were contracted to build a new brick built substation at the Hollingbourne site....
September 2013
Installation of 325km of 48 fibre cable route refurbishment , new cable route, Joint bays and UTX’s...
January 2013
November 2013
Installation of 335km of 48 fibre cable route refurbishment , new cable route, Joint bays and UTX’s...
January 2013