ABOUT THE PROJECT
Sunville Rail were awarded the contract by our client Octavius Infrastructure as part of the SID027 HV
Feeder Renewals Package 4 - F1960 to install new route and existing route refurbishment works
required for the containment of the new HV cables at Imperial Wharf
PROJECT OVERVIEW
Sunville Rail were required to supply the necessary labour, plant, equipment and materials to
undertake the construction of TTS and Concrete troughing route and refurbish existing route for
installation of new HV cables
Sunville were responsible for the below during duration of works;
• Provide all plant and equipment to complete scope of works.
• Provide all provision of labour
• Provide planned look ahead and hour by hour reporting of works
• Concrete and TTS troughing install
• Vegetation clearance of route
• Provide HV competent person and assessment throughout duration of works
• Track trolley and trained operatives to deliver materials along platform from trackside
• Working on solid and trestle platforms
• Install URX and reinstate.
• Install 6 way Cubis ducting
• Installation of buried route
• Identification and tagging of existing services