Sunville rail were awarded the contract to pull and install 2 x New 5 core cables 375M long at Morden.

Project Overview

Following a report on the existing LV cable supplying power between the REC Switch room & North Wash Plantroom at Morden train depot.

Sunville rail were awarded the contract to pull and install 2 x New 5 core cables 375M long at Morden.

Sunville rail carried out the following works:

·         Survey, design and planning

·         vegetation clearance along cable route

·         Break out existing concrete to form trench

·         Reinstate concrete to new trench

·         Pull and install 375M of LV cables and feed through buried duct and URX section

·         Remove excess waste from site