Installation of 335km of 48 fibre cable route refurbishment , new cable route, Joint bays and UTX’s
Covering circa 355 km of optical fibre installation, Sunville Rail Limited were selected to renew life expired electro-mechanical control systems employed at Raynes Park and Selhurst electrification control areas.
This involved the delivery of an enhanced communications network to traction electrification buildings located in existing electro-mechanical areas of current Electrification Control Room (ECR) operation – with connections in close proximity to telecommunication equipment rooms where appropriate.
Completing a wide range of both installation and testing works, Linbrooke’s scope of works included:
The project had a further requirement for slack to be left in each of the cable sections that were coiled into loop bays, stakka boxes or in dedicated troughing routes. Conducting end to end testing of 48 fibre sections, Linbrooke also capped all the cable ends upon testing completion and confirmed the exact GPS locations.